Resource International LTD, located just north of Richmond Virginia in Ashland, Hanover County, Virginia, Satellite office in Hampton Roads Virginia, Chesapeake, Virginia Beach. We Provide excellence in the following service areas Civil Engineering,Civil Engineers,Land Development,Land Surveying,Land Planning,Site Engineering,Environmental Scientists,Wetland Services,Stream Restoration,Solid Waste Engineering. We offer better service at a price that is competitive with other local engineering firms such as Timmons Group, Balzer & Associates, Kimley Horn, CDM, Draper Aden, HDR, Golder, ch2mhill, Mattern and Craig. Our experience is second to none. At Resource International, we challenge ourselves to rethink the traditional, to apply innovative and sustainable technology and to identify creative engineering and environmental solutions in order to earn our clients for life.

Dominion Power
Chesapeake Energy Center

Services:

  • Pond Sludge Sampling
  • Sludge Drying/Blending Testwork
  • Surveying
  • Pump/Piping Sizing and Relocation design
  • Closure design of existing pond utilizing Coal Combustion Byproducts
  • Design of new settling pond with membrane liner
  • Specifications and QA/QC Manual
  • Construction QA/QC Onsite
  • Permit documentation for DEQ

Mr. Bob Jackson
Project Manager
Dominion Virginia Power
Chesapeake Energy Center
2701 Vepco Street
Chesapeake, Virginia 23323

This multi-year project began with a need to have more settling space for a washwater stream from the power plant. Certain washout waters were required to be lime treated to precipitate metal ions prior to final disposition of the water. The 2 acre pond installed about 30 years ago was becoming full and was deteriorating. The Owner first considered the cleaning out of the pond and relining it for future use. With Resource assistance in alternatives analysis, it was determined that it would be more cost effective to close the existing pond in place, and to develop a new pond adjacent to it.

Resource then designed a new membrane lined lagoon, including new piping and pump locations. The new design included inlet and outlet structures, and a pH mix tank. Resource also provided construction QA/QC oversight. Resource also provided construction QA/QC oversight on the filling, membrane capping, and closure of the existing pond.